Skip to content
info@acsklima.com
+90 (232) 866 20 50
Follow us on
Home
Corporate
Corporate
About Us
Certificates
Human Resources
Products
Products
Air Handling Unit
AHU General Features
Fresh Air
Hygienic AHU
Packaged Hygienic AHU
AHU With Heat Recovery
Pool Dehumidification Unit
Package Rooftop Unit
Condensing Unit
Heat Recovery Ventilation Unit
Energy Recovery Ventilator
Fan Coil Unit
Ecology Unit
Water Source Heat Pump
Exhaust Fan
Laminar Flow Unit
Hepa Filter Box
Solutions
References
Support Center
Contact Us
Start-up form of
Air Handling Unit
Contact Person
Email
Telephone
Fax No
Customer Name
Project Name
City of the project
Adana
Adıyaman
Afyonkarahisar
Ağrı
Amasya
Ankara
Antalya
Artvin
Aydın
Balıkesir
Bilecik
Bingöl
Bitlis
Bolu
Burdur
Bursa
Çanakkale
Çankırı
Çorum
Denizli
Diyarbakır
Edirne
Elazığ
Erzincan
Erzurum
Eskişehir
Gaziantep
Giresun
Gümüşhane
Hakkari
Hatay
Isparta
Mersin
İstanbul
İzmir
Kars
Kastamonu
Kayseri
Kırklareli
Kırşehir
Kocaeli
Konya
Kütahya
Malatya
Manisa
Kahramanmaraş
Mardin
Muğla
Muş
Nevşehir
Niğde
Ordu
Rize
Sakarya
Samsun
Siirt
Sinop
Sivas
Tekirdağ
Tokat
Trabzon
Tunceli
Şanlıurfa
Uşak
Van
Yozgat
Zonguldak
Aksaray
Bayburt
Karaman
Kırıkkale
Batman
Şırnak
Bartın
Ardahan
Iğdır
Yalova
Karabük
Kilis
Osmaniye
Düzce
Province of the project
Preferred start update
Dear Project Officer; In order for your product to start up in a timely and healthy manner, please check the "Yes" or "No" boxes by examining the questions below. Make sure to review the assembly diagram in the user and assembly manual or which you will request from ACS. If this form is not delivered to ACS Technical Service at least 7 working days before your start up date, the start up process does not start. When our team arrives at your worksite, if the start up conditions are not ready or missing, the process of start up for the second time will be made with a fee. If you need extra information about this form or your device, ACS will gladly support you. Best wishes for a successful business together.
If the products replaced in the spots in the project
Yes
No
If the installation and cell connections of the devices that have been moved to their places have been made on a very flat surface?
Yes
No
If all the wiring(and all related cableworks) have to be completed as per manufacturer’s technical specifications
Yes
No
All electric wiring must be completed between main switcboard and unit. All cables must be fixed
To be replied by ACS
All automatic control equipment must be installed on unit
To be replied by ACS
Heating and Cooling Coils must be equipped with three way valves and servo motors. And water supply must be started
Yes
No
The water and electrical connections of the humidifiers must be completed
Yes
No
The junctions of the cells of the air handling units should be made in such a way that they do not leak air.
To be replied by ACS
If the cleaning the inside of the air handling units have been performed (dust from the construction site, soil, etc.)
Yes
No
Electrical connections must be made in such a way that lighting switches and emergency stop buttons work.
To be replied by ACS
Drain water and siphon connections must be done
Yes
No
All staff who will be trained for use of the units must be ready
Yes
No
Note: Additional training will be under extra fee
If you have an automation system installed on your device, answer the following questions:
Yes
No
If the installation of automatic control equipment has been completed on the device.
Yes
No
All data wiring must be completed and all automatic control equipments must be in function.
To be replied by ACS
If the automatic control equipment and control panel are programmed and operational..
Yes
No
If the automator of your company has the ability to complete the preparations and work with the ACS team during the start up process
Yes
No
Additional details
Product Serial No
Distance between the condenser unit and the product
Send