Skip to content
info@acsklima.com
+90 (232) 866 20 50
Follow us on
Home
Corporate
Corporate
About Us
Certificates
Human Resources
Products
Products
Air Handling Unit
AHU General Features
Fresh Air
Hygienic AHU
Packaged Hygienic AHU
AHU With Heat Recovery
Pool Dehumidification Unit
Package Rooftop Unit
Condensing Unit
Heat Recovery Ventilation Unit
Energy Recovery Ventilator
Fan Coil Unit
Ecology Unit
Water Source Heat Pump
Exhaust Fan
Laminar Flow Unit
Hepa Filter Box
Solutions
References
Support Center
Contact Us
Start up form of
Package Type Hygienic AHU
Contact Person
Email
Telephone
Fax No
Customer Name
Project Name
City of the project
Adana
Adıyaman
Afyonkarahisar
Ağrı
Amasya
Ankara
Antalya
Artvin
Aydın
Balıkesir
Bilecik
Bingöl
Bitlis
Bolu
Burdur
Bursa
Çanakkale
Çankırı
Çorum
Denizli
Diyarbakır
Edirne
Elazığ
Erzincan
Erzurum
Eskişehir
Gaziantep
Giresun
Gümüşhane
Hakkari
Hatay
Isparta
Mersin
İstanbul
İzmir
Kars
Kastamonu
Kayseri
Kırklareli
Kırşehir
Kocaeli
Konya
Kütahya
Malatya
Manisa
Kahramanmaraş
Mardin
Muğla
Muş
Nevşehir
Niğde
Ordu
Rize
Sakarya
Samsun
Siirt
Sinop
Sivas
Tekirdağ
Tokat
Trabzon
Tunceli
Şanlıurfa
Uşak
Van
Yozgat
Zonguldak
Aksaray
Bayburt
Karaman
Kırıkkale
Batman
Şırnak
Bartın
Ardahan
Iğdır
Yalova
Karabük
Kilis
Osmaniye
Düzce
Province of the project
Preferred start update
Dear Project Officer; In order for your product to start up in a timely and healthy manner, please check the "Yes" or "No" boxes by examining the questions below. Make sure to review the assembly diagram in the user and assembly manual or which you will request from ACS. If this form is not delivered to ACS Technical Service at least 7 working days before your start up date, the start up process does not start. When our team arrives at your worksite, if the start up conditions are not ready or missing, the process of start up for the second time will be made with a fee. If you need extra information about this form or your device, ACS will gladly support you. Best wishes for a successful business together.
If the products replaced in the spots in the project
Yes
No
If the installation and cell connections of the devices that have been moved to their places have been made?
Yes
No
If all the wiring(and all related cableworks) have to be completed as per manufacturer’s technical specifications
Yes
No
All electric wiring must be completed between main switcboard and unit. All cables must be fixed
To be replied by ACS
All automatic control equipment must be installed on unit
To be replied by ACS
All data wiring must be completed and all automatic control equipments must be in function.
To be replied by ACS
All softwares for automatic control equipments and control board must be installed and must be in use
To be replied by ACS
Heating and Cooling Coils must be equipped with three way valves and servo motors. And water supply must be started
Yes
No
The water inlet and water drainage connections of the humidifiers must be completed
Yes
No
The junctions of the cells of the air handling units should be made in such a way that they do not leak air.
To be replied by ACS
If there are VAV units and if it is requested connection of these to BMS all electric wiring must have beeen done untill automation control board.
Yes
No
If there is duct type electric heater , proper cable must have been installed between electric Resistance and AHU automation control panel.
Yes
No
If there are VAV or electric heater in ceiling ,proper service door (min 60x60 cm) must have been installed on the ceiling .
Yes
No
Drain water and siphon connections must be done
Yes
No
Wherever the control panel of air handling units is desired to be located, that location; 1 x 2x0.75 and 1 x 3x0.75 shielded cable must be drawn.
Yes
No
If the pollution information of the HEPA filters is to be obtained, 2x0.75 cables must be drawn for each HEPA box and an service door of at least 60x60 cm must be made on the ground.
Yes
No
A 2x0.75 cable must be drawn between the suction grill and the air handling unit automation control panel. (For room temperature control)
Yes
No
All staff who will be trained for use of the units must be ready
Yes
No
Note: Additional training will be under extra fee
Additional details
Product Serial No
Distance between the condenser unit and the product
Send